currently drilling 2 holes per day, 60 to 80 metres with a few deeper so about 2800 completed of 4000 metre program, I gather they are currently drilling "muldoon", and who is south of Muldoon ??, yep, Polaris, and they are doing very nicely.
currently drilling 2 holes per day, 60 to 80 metres with a few...
Add to My Watchlist
What is My Watchlist?