LKE 1.69% 5.8¢ lake resources n.l.

Theoretically, to produce battery grade Li2CO3 you would need...

  1. 3,463 Posts.
    lightbulb Created with Sketch. 3013
    Theoretically, to produce battery grade Li2CO3 you would need the Carbonation stage onwards which is a very simple step. No ponds or Calcium and Magnesium removal stages as those impurities are removed through the ion exchange process. No need for a purification circuit either.
    This is why the Phase 1 engineering study suggested Opex of US$2600pt was possible.
    AIMHO
    Last edited by Sjlasx: 14/08/19
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
(20min delay)
Last
5.8¢
Change
-0.001(1.69%)
Mkt cap ! $96.23M
Open High Low Value Volume
5.9¢ 6.0¢ 5.7¢ $273.4K 4.689M

Buyers (Bids)

No. Vol. Price($)
3 1049999 5.8¢
 

Sellers (Offers)

Price($) Vol. No.
5.9¢ 15000 1
View Market Depth
Last trade - 16.10pm 02/05/2024 (20 minute delay) ?
Last
5.9¢
  Change
-0.001 ( 0.00 %)
Open High Low Volume
5.9¢ 6.0¢ 5.7¢ 1666393
Last updated 15.59pm 02/05/2024 ?
LKE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.