LKE 7.69% 4.2¢ lake resources n.l.

POWER Environmental permitting is a large piece of the Kachi...

  1. 16,935 Posts.
    lightbulb Created with Sketch. 2633
    POWER Environmental permitting is a large piece of the Kachi ESIA submission.

    How is it possible to make a ESIA submission, without the certainty of any Power source.

    Q1 2024 was the original date slated for Kachi’s ESIA…and Q1 2025 is slated for FID.

    Dicko thinks the market’s eyes and ears, are painted on.

    IMO DYOR
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.