Dont forget that modular design also allows for additional sections and upgrades to be added or moved as needed, in the instance that the production needs to be scaled up or a more efficient process is introduced.
The pilot plant that is on-site now will likely be the core/foundation plant and have additional modules added to it.
- Forums
- ASX - By Stock
- LKE towards TOP-5
Dont forget that modular design also allows for additional...
-
- There are more pages in this discussion • 18,081 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
-0.001(2.44%) |
Mkt cap ! $66.74M |
Open | High | Low | Value | Volume |
4.0¢ | 4.1¢ | 3.9¢ | $256.9K | 6.439M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 1434089 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 182279 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 1434089 | 0.039 |
26 | 4193233 | 0.038 |
19 | 1906248 | 0.037 |
20 | 1642219 | 0.036 |
32 | 2411946 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 182279 | 4 |
0.041 | 1683948 | 8 |
0.042 | 796890 | 6 |
0.043 | 1540884 | 10 |
0.044 | 1028389 | 6 |
Last trade - 16.10pm 01/10/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online