With the FID,along with DFS&ESIA likely to be pushed out even further,i suspect that construction has not even begun to build the gigantic 50,000tpa plant that is meant to be in production in 2024. LKE would be far better off sticking to realistic timelines and toning down on the marketing hype - leave such statements as "location,location,location" to cheesy real estate reality shows. The rose coloured glasses here is astounding, hype and hope can only go on for so long before the tulip falls!
- Forums
- ASX - By Stock
- LKE
- LKE towards TOP-5
LKE towards TOP-5, page-6262
-
-
- There are more pages in this discussion • 17,880 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.001(2.44%) |
Mkt cap ! $70.07M |
Open | High | Low | Value | Volume |
4.1¢ | 4.3¢ | 4.0¢ | $137.3K | 3.272M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 130536 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 251051 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 122000 | 0.041 |
7 | 466000 | 0.040 |
5 | 263775 | 0.039 |
8 | 522366 | 0.038 |
6 | 553081 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 159000 | 2 |
0.043 | 703408 | 7 |
0.044 | 568749 | 5 |
0.045 | 838013 | 11 |
0.046 | 417572 | 5 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online