GLB
A total of around $12 million per annum. It would seem that capex and opex are relevant to an assessment of whether or not 30MW would be a sound investment.
Lets assume for the sake of this exercise, 7million per 5MW panel - six panels plus one spare gives 35 million plus infrastructure (two already installed - sunk cost) plus surface infrastructure - guess at an additional 10-15? million (3-5 million? installed sunk cost)- gives a total of 45-50million plus opex at say 7? million per annum. The accountants ICXP? karma? amongst us should be able to generate an IRR for us based upon these or better figures?
Cheers
Temp
- Forums
- ASX - By Stock
- CNX
- lnp
lnp , page-16
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CNX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online