Thanks for the info Bob77. I know we will find out soon enough but it certainly appears GHD were involved in the dam from geotech to design to construction.
" GHD was engaged by Red 5 Limited to carry out the detailed design of the tailings storage facility (TSF). GHD also provides construction support at the Siana Gold mine site in Surigao Del Norte. Services rendered:
Geotechnical investigations
Detailed design of the tailings storage facility and raw water dam
On-site construction support to include quality assurance "
RED Price at posting:
62.0¢ Sentiment: Hold Disclosure: Held