I guess he can make another offer before drilling the other 3 wells. But isn't he limited by the 3% creep rule?
I think 1st drill should be done in the next 2 months. Don't they move on to NED-1?
I think time will be of the essence, as STX will be waiting for the rig.
- Forums
- ASX - By Stock
- NWE
- Lockyer Deep - From the horse's mouth OR What the JV partner really thinks about Lockyer Gas
Lockyer Deep - From the horse's mouth OR What the JV partner really thinks about Lockyer Gas, page-314
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)