As Hardman has previously announced, production from the field averaged 66 mbopd
for the month of March and 53 mbopd for April 2006. Production for the period 1
May to 10 May 2006 has averaged 45 mbopd.
The Operator has reported that the principal reasons for the lower production
are the minimal contribution from the two production wells in the northern part
of the field and gas and water management issues. The failure last week of a gas
compressor onboard the FPSO, Berge Helene, will further delay the commissioning
of gas re-injection to the Banda field and therefore resolution of facilities
gas handling issues, as well as the availability of gas lift to support
production.
- Forums
- ASX - By Stock
- london announcement
HDR
hardman resources limited
As Hardman has previously announced, production from the field...
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)