This..
The resultant PSD is broad (Figure 1) which is not typical of HM deposits and reflects the unique geological setting of the Rosewood Project. It is interpreted that the HM has been sourced from the weathering and break down of the surrounding highly titaniferous Muckanippie Suite basement rock and has not travelled far before deposition in an interpreted fluvio-deltaic environment (Figure 4). These results indicate that the Rosewood HM is coarse grained and likely highly amenable to produce excellent mineral recoveries using conventional gravity spiral processing techniques.
PTR are in the sweet spot the weathered part of the basin. Where the quality and quantity of the project is expanding and now the PSD makes it economical. Im looking forward to more results. Mid March should be next week for drilling.
- Forums
- ASX - By Stock
- Long Term Holders - Technical Chat
PTR
petratherm ltd
Add to My Watchlist
3.33%
!
29.0¢

This..The resultant PSD is broad (Figure 1) which is not typical...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
29.0¢ |
Change
-0.010(3.33%) |
Mkt cap ! $100.2M |
Open | High | Low | Value | Volume |
29.0¢ | 29.5¢ | 29.0¢ | $41.59K | 142.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15544 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.0¢ | 190499 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15544 | 0.290 |
1 | 12280 | 0.285 |
2 | 150000 | 0.280 |
1 | 50088 | 0.275 |
3 | 22414 | 0.270 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 190499 | 3 |
0.305 | 10000 | 1 |
0.310 | 90000 | 1 |
0.320 | 140044 | 3 |
0.330 | 17890 | 3 |
Last trade - 15.59pm 16/06/2025 (20 minute delay) ? |
Featured News
PTR (ASX) Chart |