long term production target has increased from 100000 oz to 150000 oz per yaer.
Fekola minearl zone is more than 1km long, it could be a 1m oz resources deposit.
- Forums
- ASX - By Stock
- long term production target increased
long term production target has increased from 100000 oz to...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PIR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online