looking for another view on tgf

  1. 72 Posts.
    anybody have a LT view on this gold miner in china?

    from announcement 26 FEB 2009-:

    PRE-FEASIBILITY STUDY FOR GOLD MOUNTAIN PROJECT
    • Open pit optimisation results include 42 million tonnes of ore processed
    capturing 1.032Moz of resources and 585,120oz of recovered gold.
    • Low estimated total Capex of $US41 million for heap leach operation.
    • Low Strip ratio of 1.5 to 1 (waste to ore).
    • Production rate of 5Mtpa for an average annual production of 65,000 ounces.
    • Estimated initial mine life of 9 years.
    • Estimated cash operating cost of US$514 per ounce.
    • Project pre-tax NPV of US$48 million at 8% discount rate and pre-tax IRR of 25%.

    http://www.tianshangoldfields.com.au/
 