Papertigger,
Thats not the only concern. We need trenching grades to be good and
drilling targets mapped out by the geo. Another major concern or
potential is the availability of the contractor. All labs and
contractors are flat out. Labs dont have enuf time to get the testing
done and hence MKY assays have been delayed.