Maybe such a long license verification period in September came as a surprise, and that shutdown period was not fully projected.
So Challenger is mainly getting over a couple of hurdles and is not really a bad mine, right? Developing over to Challenger West and past the fault, after which the quarters should have a far better production to development ratio.
Did they say the Challenger resource update is due in 2 weeks?
As for costs, I think Chatree will be stable and Challenger slightly worse for 2 quarters. Challenger has a large and highly variable depreciation cost. Whether Challenger's costs rise or fall depends a lot on the depreciation.
Can somebody explain what Gavin meant about 5 meter wide tunnels diluting 2 meter wide ore? Is that a development tunnel or production?
- Forums
- ASX - By Stock
- looks as if sp is falling through floor
Maybe such a long license verification period in September came...
Featured News
Add KCN (ASX) to my watchlist
|
|||||
Last
$1.58 |
Change
-0.040(2.47%) |
Mkt cap ! $407.2M |
Open | High | Low | Value | Volume |
$1.61 | $1.63 | $1.57 | $1.610M | 1.003M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 14999 | $1.58 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.60 | 22071 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 14999 | 1.580 |
1 | 4464 | 1.570 |
1 | 4464 | 1.565 |
2 | 24464 | 1.560 |
1 | 4464 | 1.555 |
Price($) | Vol. | No. |
---|---|---|
1.595 | 22071 | 1 |
1.615 | 3720 | 1 |
1.620 | 13720 | 2 |
1.625 | 23720 | 2 |
1.630 | 3720 | 1 |
Last trade - 16.10pm 01/07/2024 (20 minute delay) ? |
Featured News
KCN (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online