Guys, guys, guys...
I hate to rain on your parade, but check out the tonnages that they are dealing with. TTC, this is what you're missing.
Posted on the Day-Traders Thread
KMC: Production throughput is exceptional for their market cap, but be careful with 'mining on a calculator'. We don't know how large the resource is, and also you are assuming that the ~4g/t grade is sustained throughout the mines operation.
At a really, really rough guess for a recovered reserve...
Each stope is about 7m high, 7m wide and 150m long as per industry standards and page 1 of the August 25 announcement.. Each stope would contain around 20kt of ore assuming a groundmass density of 2.7g/t.
It looks like there are about 12 stopes being planned as per page 3 of the same announcement.
So you are looking at a total ore tonnage of about 240kt. If they mine 700t a day, then the mine will only last about one year.
Just be careful with those PEs.
Guys, guys, guys...I hate to rain on your parade, but check out...
Add to My Watchlist
What is My Watchlist?