Southern portion of the main zone:
250x30x250 x 2.8 = 5,250,000 @ ~1.3-1.5%
Central portion of the main zone:
250x40x250 x 2.8 = 7,000,000 @ ~1.7-1.9%
Northern portion of the main zone:
150x30x200 x 2.8 = 2,520,000 @ ~1.7-1.9%
Total for main zone:
14,770,000 @ ~1.6-1.8%
Southern portion of the west zone:
100x25x150 x 2.8 = 1,050,000 @ ~1.8-2.0%
Central/Norhtern portion of the west zone:
220x50x180 x 2.8 = 5,544,000 @ ~1.8-2.0%
Total for west zone:
6,594,000 @ ~1.8-2.0%
Total resource size:
21,364,000 @ ~1.6-1.9%
Total contained Li2O = 350,000 - 400,000 (T)
This is my low-base resource size - I've barely assumed any mineralisation beyond the drill holes already reported (I don't pretend to understand geology so I won't make assumptions regarding it).
I believe depth, thickness and quality will all be upgraded significantly and result in a larger JORC than I have inferred here. Especially when it comes to the west zone.
IMO the numbers above would represent at least a measuredresource size once drilled out, adding indicated and inferred would almost double it.
BGS Price at posting:
37.5¢ Sentiment: Buy Disclosure: Held