MAT 0.00% 2.6¢ matsa resources limited

Looks ready to lift off, page-19

  1. 1,817 Posts.
    lightbulb Created with Sketch. 472
    For diamond drilling It depends on the ground conditions, if the mud is mixed correctly etc. The slow process is called diamond core triple tube. Only expect 30-40m a day using this process. I have been involved as an off-sider a few years ago doing this, so I know what I'm talking about. The core is taken at 1m samples, however I believe there is also a faster process at 2m samples per core extraction. Also 200m+ can be achieved for RC drilling, we drilled a 230m iron ore hole easily in one day, however the deeper you go over 300m the slower the process becomes for obvious reasons.
 
watchlist Created with Sketch. Add MAT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.