This is my first post and it is a reply to plough. Currently work at Olympic Dam for the last 13 years, And the yellow zone or gold zone stopes run at on average 5-7g a tonne which is any thing but low grade.
A geologist friend of mine on site who i worked with at wodlawn mines just up the road from Braidwood. Has been giving me updates as data is available and he is starting to like what he sees.
Near surface deposit good grade would have been small open-cut underground but for the locals and governing body. Orebody surrounded by Granite so god mining conditions expected thats why i have my resume in all ready after talking to a contact on site
All the best to CRC.
CRC Price at posting:
16.5¢ Sentiment: LT Buy Disclosure: Held