On 10/01/18 MH said on Twitter “final optimisation of the detailed flow sheet due shortly!” Surely this must be before end of Jan so agree no need to panic.
LPI Has the Best Pre-developed Lithium Resource on the Planet, page-3
Add to My Watchlist
What is My Watchlist?