From LSE MTR forum……
Poster – Stephen_Pearce (12:28 LON TIME)
‘I've roughly digitised the interpreted T3 dome marked by MOD
The area is 76560000 m²
Or 76.5 million square metres
If the mineralisation is on average 30m thick, that equals 2,296800000 cubic metres
If the density of the ore is 2.4 tonnes per cubic metre, that equals 5512320000 tonnes of ore
If the Copper grade is 1%, that equals 55123200/ 55 MT of contained Copper.
In summary
T3
5.5 Billion tonnes of ore
55 Million tonnes of contained Copper
Compare to known existing resources in the Kalahari to date...
Cupric Boseto
177 Million tonnes of ore
@ 1.37% Cu = 2.4 Million tonnes of contained Copper
Cupric Zone 5
67.1 Million tonnes of ore
@ 1.9% Cu equals 1.27 Million tonnes of contained Copper
Cupric Banana
191 Million tonnes of ore
@ 0.6% Cu equals 1.15 Million tonnes of contained Copper
MOD Mahumo
2.7 Million tonnes of ore
@ 2% Cu equals 54 thousand tonnes of contained Copper
T3
5.5 Billion tonnes of ore
55 Million tonnes of contained Copper
Kalahari
0.4378 Billion tonnes of ore
4.8 Million tonnes of contained Copper’
wow.!
Add to My Watchlist
What is My Watchlist?