88E 20.0% 0.2¢ 88 energy limited

LSE tonight, page-7672

  1. 4,299 Posts.
    lightbulb Created with Sketch. 28
    Bill Gates.

    No problem Bill everything going to plan were is the production plan.
    August on Tuesday .
    17 May
    The immediate forward program involves completion of wireline logging, cementing the production liner and demobilising the Arctic Fox. Subsequently, in early June, micro stimulations will be performed to calibrate the stress profile in the zone of interest. This data will then be combined with the processed and interpreted log information in order to select the optimal location of perforations for the main stimulation operation. Execution of the main stimulation is scheduled to take place in the third week of June with cleanup of stimulation fluid over the following one to two weeks. The well will then be placed on production test, initially at a choked back rate in order to ensure that proppant is not displaced from the reservoir.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(20.0%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $78.15K 38.57M

Buyers (Bids)

No. Vol. Price($)
122 120098264 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 583908266 234
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.