88E 25.0% 0.3¢ 88 energy limited

Bill Gates. No problem Bill everything going to plan were is the...

  1. 4,299 Posts.
    lightbulb Created with Sketch. 28
    Bill Gates.

    No problem Bill everything going to plan were is the production plan.
    August on Tuesday .
    17 May
    The immediate forward program involves completion of wireline logging, cementing the production liner and demobilising the Arctic Fox. Subsequently, in early June, micro stimulations will be performed to calibrate the stress profile in the zone of interest. This data will then be combined with the processed and interpreted log information in order to select the optimal location of perforations for the main stimulation operation. Execution of the main stimulation is scheduled to take place in the third week of June with cleanup of stimulation fluid over the following one to two weeks. The well will then be placed on production test, initially at a choked back rate in order to ensure that proppant is not displaced from the reservoir.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $72.33M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $7.987K 2.663M

Buyers (Bids)

No. Vol. Price($)
126 136667635 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 645072618 229
View Market Depth
Last trade - 10.02am 07/10/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.