Would appear from the Philippine Stock Exchange release today that they are attempting to drill a 3rd hole as the first two have initially encountered difficulty with the guide base of Lumba-Lumba-1, then the 30 inch conductor casing would not pass through the 2nd hole.
The 3rd hole has had the 30-inch conductor casing set and cemented.
I guess that's life in the world of oil drilling.
MI
- Forums
- ASX - By Stock
- TAP
- lumba lumbering along
lumba lumbering along
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)