M24 mamba exploration limited

First pass drilling at Hyden 14 holes report 37.14m average...

  1. 4,839 Posts.
    lightbulb Created with Sketch. 1038
    First pass drilling at Hyden 14 holes report 37.14m average mineralized clay intersection for average of 1130.36 ppm TREO, Size is (2,000m x 1,1000 x 37.14m) x 2.5 t = 185,700,000 tonnes (from surface).

    AR3 by comparison has clay horizon of 2-3 m with 10 m of overburden. AR3 current JORC is 101Mt @ 818ppm. BUT have completed positive met tests. M24 is undertaking met tests so significant risk remains pending results. AR3 budgeted $1.2M first year and $2.8M for second year drilling spread over 10km x 3 km area. M24 drilling will be much cheaper because clay horizon averages 37.14 (and open at depth) compared with 2-3m, so number of holes required will be significantly less to get a bigger JORC.

    AR3 EV on listing in 2021 was $21.21M for a JORC of 39.2Mt. Current JORC for M24 is around $4M. Bear markets create massive arbitrage opportunities for very significant wealth creation. Please do your own research. Good luck to all longs.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.3¢
Change
0.000(0.00%)
Mkt cap ! $3.837M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 407022 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.4¢ 50000 1
View Market Depth
Last trade - 16.21pm 11/08/2025 (20 minute delay) ?
M24 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.