First pass drilling at Hyden 14 holes report 37.14m average mineralized clay intersection for average of 1130.36 ppm TREO, Size is (2,000m x 1,1000 x 37.14m) x 2.5 t = 185,700,000 tonnes (from surface).
AR3 by comparison has clay horizon of 2-3 m with 10 m of overburden. AR3 current JORC is 101Mt @ 818ppm. BUT have completed positive met tests. M24 is undertaking met tests so significant risk remains pending results. AR3 budgeted $1.2M first year and $2.8M for second year drilling spread over 10km x 3 km area. M24 drilling will be much cheaper because clay horizon averages 37.14 (and open at depth) compared with 2-3m, so number of holes required will be significantly less to get a bigger JORC.
AR3 EV on listing in 2021 was $21.21M for a JORC of 39.2Mt. Current JORC for M24 is around $4M. Bear markets create massive arbitrage opportunities for very significant wealth creation. Please do your own research. Good luck to all longs.
- Forums
- ASX - By Stock
- M23 v AR3
M24
mamba exploration limited
Add to My Watchlist
0.00%
!
1.3¢

First pass drilling at Hyden 14 holes report 37.14m average...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.837M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 407022 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 407022 | 0.013 |
2 | 691000 | 0.012 |
3 | 819000 | 0.011 |
3 | 352000 | 0.010 |
1 | 333330 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 50000 | 1 |
0.015 | 506665 | 2 |
0.016 | 280000 | 2 |
0.017 | 205555 | 2 |
0.018 | 280000 | 2 |
Last trade - 16.21pm 11/08/2025 (20 minute delay) ? |
Featured News
M24 (ASX) Chart |
Day chart unavailable