Madeley Centre case study quarterly update
Quarterly performance figures for Q4 2014 for BlueGEN installed at the Madeley Centre have been published. This BlueGEN was installed in January 2013 and both the electricity output and heat output are being continually monitored. The results exceed expectations on heat recovery and confirm that BlueGEN is consistently generating electricity at a rate of 36kWh per day, day in, day out.
In this scheme the financial benefits of the BlueGEN are used to reduce the service charges of the residents of the adjoining sheltered accommodation scheme
Download the case study here:
http://www.ceramicfuelcells.co.uk/f...udies/Madeley_Centre_Case_Study_-_Q4_2014.pdf
- Forums
- ASX - By Stock
- CFU
- Madeley Centre case study quarterly update
Madeley Centre case study quarterly update
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)