Here is Eco's latest presentation
Namibia has been under the radar since Guyana, however "Near term drilling planned 2019"
"Exxon, have entered the block between Eco's blocks and Exxon, M&P, Total and Shell expecting to drill 4 wells 2019/2020"
https://www.ecooilandgas.com/wp-content/uploads/2019/08/ECO_Corporate-Presentation_August-2019.pdf
In addition AziNam have PEL30 Cooper block to be drilled early 2020 and Galp have two wells early 2020, so at least 7 wells coming up in Namibia
The Maersk Viking is berthed in Walvis Bay and very soon to start the campaign
If potential suitors want a deal with GBP, it will be much cheaper closing the deal ahead of planned upcoming wells
IMHO they have two weeks before the MV spins the drill bit