"they'd still produce a 62% concentrate, but they'd require about 13% less ore on average to feed into the plant to produce the same product... hence operating costs would come down. "
Either that or they keep tonnage leaving the mill the same but of a higher grade.
Would do that by having the same quantity of ore on the ROM but push the mass recovery to the right for a higher grade than 62% for a corresponding higher price per ton of ore even if they kept concentrate tonnage the same.
- Forums
- ASX - By Stock
- maiden jorc resource
"they'd still produce a 62% concentrate, but they'd require...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & MD
Charles Armstrong
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online