Progress seems to fall in line with what I have read:
From TSV's Quarterly:
"The program achieved seven fracture stimulation stages over the potential 280m net pay section and injected over 380 tonnes of proppant into the targeted gas sand zones from the top of the reservoir zone at 3,800m down to the bottom frac zone at 4,250m."
Compared to what I found on the WWW:
"Typically the propane liquid is recovered at 2 m3 per hour at a formation drawdown of 15% or less. These targets are intended to ensure proppant is not drawn out of the frac while controlling recovery within the capacity of typical surface equipment. Recovery of the LPG load fluid is expected to exceed 90%. Note that well capability and surface flow equipment capacity may change recovery rate expectations; however the overall load fluid recovered should not change."