What do you guys expect.
Wait for this month's core sample reports for the several programmed drill holes.
The share price should rise in anticipation of a good result.
The drilling had been delayed through no fault of the directors. Just blame the weather.
There could still be a further delay in drilling with possible flooding occurring in South Australia.
- Forums
- ASX - By Stock
- TAS
- management needs a shake-up maybe
management needs a shake-up maybe, page-4
Featured News
Add TAS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.026M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TAS (ASX) Chart |
Day chart unavailable