I had to go get a new calculater as the old one didnt have enough zeros to work out the potential resource size from the laterite deposit
10,000 metres * 10,000 metres * 6 metres deep * SG2.7 = 1.6 billion tons
1.6 billion tons * $300 a ton = $486 billion potential inground resource
thats $486,000,000,000
Obviously the NPV is a better mesasure and there are no drill results yet to confirm depth, but the current market cap doesnt do the potental resource justice.
A project of that size could easily justify its own 500km rail ($1 billion ) and $500M port and the sweetner is it could essentially be mined as a low strip hematitie iron ore deposit but instead of getting $110 a ton FOB as for iron ore you are getting paid closer to $300 a ton, so a $250 a ton margin, over a $50 a ton production cost.
- Forums
- ASX - By Stock
- ANX
- manganese heaven
manganese heaven
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ANX (ASX) to my watchlist
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.9M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.3¢ | $2.446K | 105.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1833551 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 1139472 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 833551 | 0.023 |
7 | 1326000 | 0.022 |
8 | 1959099 | 0.021 |
8 | 752050 | 0.020 |
1 | 20000 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 1139472 | 4 |
0.025 | 489068 | 2 |
0.026 | 440120 | 2 |
0.027 | 451074 | 1 |
0.028 | 500000 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
ANX (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online