AUL 0.00% 28.5¢ austar gold limited

mantle's vic pilbara kick off, page-3

  1. 4,289 Posts.
    http://www.ghd.com/global/projects/latrobe-valley/

    "Latrobe Valley Geological Modelling

    Department of Primary Industries

    Our team has a track record delivering large, complex modelling projects. They have been active in geological drilling, data management, geological interpretation and modelling of the Latrobe Valley from the 1980s up to the current day. GHD also set-up and manage the Latrobe Valley Bore data base.

    GHD's Victorian brown coal modelling experience includes the development of the digital geological model of the Latrobe Valley coal resource for DPI in 2003 and extensions to cover Stradbroke, Gelliondale and Yarragon in 2008 and 2011. This model was ground-breaking in its breadth and detail and presents a century of resource evaluation in a consistent and useable format. This regional experience is complemented by detailed modelling of the Loy Yang, Driffield, Flynn, Hazelwood, Yallourn North Extension, Gelliondale, Yarragon resources within Gippsland as well as the Maddingley resource in the state's west."


    Yarragon? Isn't that Mantle's new tenement?


    also


    GHD & Mantle -

    "GHD, a world leading engineering consultancy pre-eminent in coal geological and mine planning service provision in Victoria, has been contracted to provide exploration design, oversight and JORC reporting at Bacchus Marsh."

    http://www.mantlemining.com/announcements/988476.pdf


    Potential partners?

    http://www.latrobevalleyexpress.com.au/story/1552545/bold-coal-export-vision/

    "Senior mechanical engineer John McNaught, whose engineering consultancy firm GHD has been contracted to assist the company develop the project, said based on the proposed plant's layout and operations, the 24/7 facility would employ four teams of shift workers, plus day time administration staff, bringing the ongoing workforce to 70.

    &

    While a current coal supply memorandum of understanding with Yallourn Power Station has secured a three million tonne raw coal supply for the project's initial stages, further allocation would be needed to expand the project."

    I am sure there are lots of potential partners for Mantle's LV BC and the above is just one possibility.


    B Rubes
 
watchlist Created with Sketch. Add AUL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.