MARAMPA - 15MTPA SCOPING STUDY DEMONSTRATES ROBUST PROJECT ECONOMICS
Key Points:- A 15Mtpa Scoping Study to align the concentrate transport solution with the Infrastructure Agreement with African Minerals Limited for a standalone, open pit mining development at Marampa is now complete.
- Stage 1 concentrate production is planned at 2.5Mtpa, with a Stage 2 expansion increasing concentrate production to 15Mtpa with an overall mine life of 15 years.
- Capital investment for Stage 1 is estimated at US$435 million and US$1,927 million for Stage 2.
- Stage 1 operating costs are estimated at $45 per tonne of concentrate FOB, with an average life of mine operating cost of $46 per tonne of concentrate FOB.
- The Scoping Study Base Case has returned robust financial metrics including an ungeared (100% equity) after tax NPV10% of US$1.56 billion, an internal rate of return of 26.2% and after tax cash flows of US$5.99 billion.
- http://www.asx.com.au/asxpdf/20121005/pdf/4295xybk0nc5gb.pdf
- Forums
- ASX - By Stock
- marampa - 15mtpa scoping study ...
MARAMPA - 15MTPA SCOPING STUDY DEMONSTRATES ROBUST PROJECT...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.73M |
Open | High | Low | Value | Volume |
0.1¢ | 0.2¢ | 0.1¢ | $80.35K | 80.33M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 31658116 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 115578703 | 44 |
Last trade - 15.55pm 01/11/2024 (20 minute delay) ? |
Featured News
CLE (ASX) Chart |
Day chart unavailable