GHY: Ramsay Project Operational Update Exploration Well Testing Operations to Commence.
Highlights:
- Exploration well testing operations, which are pioneering for both Natural Hydrogen and Helium in a non-petroleum system, are set to commence today at the site of the Company’s successful Ramsay 1 and Ramsay 2 exploration wells.
- This is very much a new energy and resource play that Gold Hydrogen has confirmed with historical data, and with its recent exploration and drilling results.
- The Company’s Ramsay 1 and Ramsay 2 wells drilled late last year found Natural Hydrogen at up to 86% purity, and Helium at up to 6.8% of raw gas, as previously reported.
- The independent best estimate Prospective Resource for Natural Hydrogen on the Company’s 100% owned PEL 687 is 1.3 billion kilograms, and for Helium the mean estimated Prospective Resource is 96 billion cubic feet (Bcf) over approximately 25% of the tenement. Refer Tables 1 and 2 for full details.
- The Company has significant prospective resources with large-scale potential.
- This is the start of a very exciting technical journey, and is not dissimilar to the eventual success of existing world-renowned oil and gas energy projects, which took time to reach their full potential.
- The objectives of the exploration well tests are to obtain more samples of both Natural Hydrogen and Helium for further specialist analysis in world-leading laboratories, and to extract both Natural Hydrogen and Helium to surface.
- Testing operations are expected to take most of March, with preliminary technical results from the overall testing of both the Ramsay 1 and Ramsay 2 exploration wells program expected by April, with further detailed laboratory analysis ongoing.
- Results from the testing program will provide the Company with valuable information for future drilling and well completion designs, for the future pilot program, and longer-term commercialisation planning.
- Planning continues on the Company’s broader 2024 work program, including a regional 2D seismic program and the drilling of additional wells.
- The nearology is palpable. Let’s see what they really got. And since they got no place to go, Let it Flow, Let it Flow, Let it Flow.
- Forums
- ASX - By Stock
- March 2024 to November 2024 for BRU
BRU
buru energy limited
Add to My Watchlist
3.23%
!
3.0¢

GHY: Ramsay Project Operational Update Exploration Well Testing...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.0¢ |
Change
-0.001(3.23%) |
Mkt cap ! $23.38M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 3.0¢ | $7.558K | 251.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 122769 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 388187 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 122769 | 0.030 |
3 | 187344 | 0.029 |
4 | 206428 | 0.028 |
4 | 357037 | 0.027 |
1 | 20000 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 388187 | 4 |
0.033 | 42233 | 2 |
0.034 | 12600 | 1 |
0.035 | 577535 | 7 |
0.036 | 7770 | 1 |
Last trade - 16.10pm 20/06/2025 (20 minute delay) ? |
Featured News
BRU (ASX) Chart |