BRU buru energy limited

GHY: Ramsay Project Operational Update Exploration Well Testing...

  1. 28,569 Posts.
    lightbulb Created with Sketch. 4968
    GHY: Ramsay Project Operational Update Exploration Well Testing Operations to Commence.
    Highlights:
    • Exploration well testing operations, which are pioneering for both Natural Hydrogen and Helium in a non-petroleum system, are set to commence today at the site of the Company’s successful Ramsay 1 and Ramsay 2 exploration wells.
    • This is very much a new energy and resource play that Gold Hydrogen has confirmed with historical data, and with its recent exploration and drilling results.
    • The Company’s Ramsay 1 and Ramsay 2 wells drilled late last year found Natural Hydrogen at up to 86% purity, and Helium at up to 6.8% of raw gas, as previously reported.
    • The independent best estimate Prospective Resource for Natural Hydrogen on the Company’s 100% owned PEL 687 is 1.3 billion kilograms, and for Helium the mean estimated Prospective Resource is 96 billion cubic feet (Bcf) over approximately 25% of the tenement. Refer Tables 1 and 2 for full details.
    • The Company has significant prospective resources with large-scale potential.
    • This is the start of a very exciting technical journey, and is not dissimilar to the eventual success of existing world-renowned oil and gas energy projects, which took time to reach their full potential.
    • The objectives of the exploration well tests are to obtain more samples of both Natural Hydrogen and Helium for further specialist analysis in world-leading laboratories, and to extract both Natural Hydrogen and Helium to surface.
    • Testing operations are expected to take most of March, with preliminary technical results from the overall testing of both the Ramsay 1 and Ramsay 2 exploration wells program expected by April, with further detailed laboratory analysis ongoing.
    • Results from the testing program will provide the Company with valuable information for future drilling and well completion designs, for the future pilot program, and longer-term commercialisation planning.
    • Planning continues on the Company’s broader 2024 work program, including a regional 2D seismic program and the drilling of additional wells.
    • The nearology is palpable. Let’s see what they really got. And since they got no place to go, Let it Flow, Let it Flow, Let it Flow.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $23.38M
Open High Low Value Volume
3.0¢ 3.0¢ 3.0¢ $7.558K 251.9K

Buyers (Bids)

No. Vol. Price($)
1 122769 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 388187 4
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.