They announced this on 24th January 2018: (Cascavel Operational Update)
“A third hammer mill (25t/hr) has arrived onsite and is currently being installed and should be commissioned next week as planned. Commissioning will include processing of stockpiled waste material and low-grade ore to ensure the mill is operating optimally prior to introduction of stockpiled high-grade ore.”
Does anyone seriously believe that in the two and a half months since that announcement they don’t have any quantifiable material information to release on how that hammer mill is going?