i was reading over the march quarterly (i had nothing else better to do) and i read a few notes i had made when i originally read it.
1. page 2 states that Slurry Systems Engineering (SSE) would have the pre-feasibility study on the slurry and water pipes ready by May. Anyone heard anything about this report that was to be completed in May?
2. page 2 said the Port agreements were underway, well as of Monday that was sorted.
3. page 4 stats that phase 3 drilling should be completed by June quarter.
4. page 6 figure 1 shows that the target resource should be increased to 450mt by June.
5. page 12 sets everything out in the future activities statement.
lets just hope the management can deliver these things on time to help the price along.
anyone want to contact the company and follow up on a few of these issues?
DOW almost back at the 12 month low as i type this (11,508.70 vs 11,558.04). not pretty!!