RWD 0.00% 5.9¢ reward minerals ltd

martu opportunity cost, page-58

  1. 630 Posts.
    lightbulb Created with Sketch. 1
    The Alice Springs - Darwin line cost around $1 million/km with 90 bridges/flood culverts/high speed of 110 km per hr and high axle load trains. The grade was also maintained at about 1% with the associated earthworks.

    The Reward line would transport around 2,000 tonnes/per day or 1 train daily. It could backload supplies etc. to the mine site.

    With low loads and low frequency a much lighter line could be built - I mean iron ore lines are designed for 100 million tonnes a year and up.

    A longer term plan would be to get access to the Newman rail system.
 
watchlist Created with Sketch. Add RWD (ASX) to my watchlist
(20min delay)
Last
5.9¢
Change
0.000(0.00%)
Mkt cap ! $13.44M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 4979 5.8¢
 

Sellers (Offers)

Price($) Vol. No.
6.2¢ 91525 1
View Market Depth
Last trade - 11.12am 29/07/2024 (20 minute delay) ?
RWD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.