Grade is equally as important as tonnage. Normally, full lab test chemical analysis are required to determine the grade and this takes time. What we saw in the Hole 1 drilling update was based on visual inspection.
There is minimum 2 billion tons of potash in Paradox Basin, which is for sure. Check this out