SMM 20.0% 0.4¢ somerset minerals limited

material placement for what

  1. 735 Posts.
    lightbulb Created with Sketch. 228
    What is the reason for the 'Material Placement'?

    I can think of a few different options.

    Option 1:

    What if the recent 'slow down' of activities at Lichkvaz has flushed out the 'recalcitrent shareholders' who preveneted a 100% take over of Iberian? These approxiamtely 14% missing shares equate to roughly 7% of Tamaya's capital, which would make it a material placement.

    Option 2:

    Arco iris drilling results are so spectacular that the board is super keen to get it into production ASAP and to do this they need lots of money.

    Option 3:

    Toronto listing. The board is disappointed that the share price is where it is, but bites the sour apple and goes ahead with a listing through a Toronto broker anyway.

    What do you think?

    Cheers,
    IHS
 
watchlist Created with Sketch. Add SMM (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $4.123M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $18.42K 4.606M

Buyers (Bids)

No. Vol. Price($)
10 6634995 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 550000 2
View Market Depth
Last trade - 14.21pm 27/08/2024 (20 minute delay) ?
SMM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.