The Scott-2 well was perforated over a 6 foot interval on 6 April 2007 and flowed gas on test at a rate of 2 MMcf/d (million cubic feet per day) on an 8/64 inch choke with a flowing pressure of 5,600 psi with associated condensate. A downhole pressure buildup survey is currently underway. There are at least three additional intervals to test higher in the well that appear to be similar in character to the successfully tested zones in the Harrison-1 well.
This well is now deemed to be a commercial producer and will be connected to the sales pipeline with Harrison-1. The remaining three intervals to be evaluated will be perforated and tested once the pipeline is connected in order to sell the test gas instead of flaring. The pipeline is currently in the process of being permitted and is expected to be completed in May 2007.
-------------------
AZZ flow test.
6 foot interval
2mmcf/d
5600 psi
and still commercial.
- Forums
- ASX - By Stock
- maths lesson
The Scott-2 well was perforated over a 6 foot interval on 6...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)