FSE 0.00% 0.5¢ fuse minerals limited

goldgreg good to hear you are in for the long ride, so am...

Currently unlisted. Proposed listing date: APPLICATION WITHDRAWN ON 28 MARCH 2024
  1. 1,113 Posts.
    goldgreg good to hear you are in for the long ride, so am I!

    Agreed that transnet will build the rail and Eskom will foot the transport cost., My problem is when?

    Ditto water, Eskom have a water usage license thta is not fully utilised, at the moment, but did nyone mention the fact that the Medupi de sulphurisation plant will use 5M megacubes of water per annum more than was originally planned, and that this exceeds the estimated supply planned to be available AFTER the upgrades.

    to such an extent that both RES and FSE have been stopped from planning to use underground water for their projects?

    My point about Exxaro/Sasol JV, is that as major players with huge BEE credentials and clout, they will be pulling the lion share of infrasructure
 
watchlist Created with Sketch. Add FSE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.