-
Share
06/07/06
17:51
Share
Fang,
Apparently AEX are using an older style rig ( the more modern rigs are long term booked by majors like Anglo )
So drilling could be a little slower.
One hole = approx 5 days is my guess.
The 241 holes previously drilled had an ave depth of 53 metres.
Lets hope the first couple of announced holes are in line with or exceed previous results.
If so, that will be " kick off " day for AEX.
AEX will begin to be taken seriously.
With all these delays, I hope they have forward booked rig(s) for upcoming drilling because they are going to need more than one rig thats for sure.
-