MAY 6.25% 3.0¢ melbana energy limited

MAY Train running express to 23.5 cents- Stand Clear Please Stand Clear, page-45

  1. 3,567 Posts.
    lightbulb Created with Sketch. 1853
    Thetooch,

    Logging can take some time as they need to understand if every metre meets the minimal requirements for net reservoir. Limestone can be highly variable, and potentially a lot of it can be close to those net requirements. The pressure and fractures can be a good thing as it can make poor reservoir flow well. Even logs aren’t definitive as lab results can alter the net figure and production testing can increase it.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.002(6.25%)
Mkt cap ! $101.1M
Open High Low Value Volume
3.1¢ 3.1¢ 2.8¢ $248.3K 8.453M

Buyers (Bids)

No. Vol. Price($)
4 750509 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 24364 1
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.