FAR 3.03% 51.0¢ far limited

Slow going in Angola for our dedicated drill rig. Kamoxi-1...

  1. 824 Posts.
    lightbulb Created with Sketch. 95
    Slow going in Angola for our dedicated drill rig. Kamoxi-1 spudded on Aug 5 2014, and completed activities on Nov 4. Omosi-1 the second well in a four well program, spudded in Dec 2014, to be plugged and abandoned on April 22 2015. Over Seven months later, half the program still remains, and if continuing to operate at this pace it will be difficult to see Athena arriving in Senegal waters before years end, unless a third failure might result in COP abandoning the show in Angola altogether. On a more positive note, it is certain to believe that Athena will see it's deck first dirtied by oil come SNE-2, as Kamoxi was it's maiden drill.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.