At the same time, the Director General of the Port of Kribi signed with the same private partners, the concession agreement for the mineral terminal in the port of Kribi.
We are now before a complete

administrative framework which binds the private party as to his willingness to build these two infrastructures in the Republic of Cameroon and Congo.
From an administrative point of view, all the conditions have been met to allow for the effective start of the construction of the two infrastructures.