Hello whatsup
The twin drives could work well .
You would need to put the rails back in as I have said many times .
The water was escaping down and old stope into the shaft .
This would need to be fixed .
A rise would need to be put up between levels and the dirt tipped down to the 8 level
.4 months gives them plenty of time ,that's one cut a day on each level and only working one shift .
Dayshift with 3 workers max
The ground there is not very hard so it doesn't take long to bore out a drive 2.5 x 2.5
Good luck guys .
It would be a great little job for some up and coming miners .
- Forums
- ASX - By Stock
- Media Articles
Hello whatsupThe twin drives could work well .You would need to...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.400M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.6¢ | $26 | 1.636K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 660543 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 32615 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 660543 | 0.016 |
1 | 71499 | 0.013 |
1 | 50000 | 0.010 |
1 | 100000 | 0.009 |
1 | 120000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 32615 | 1 |
0.019 | 10000 | 1 |
0.020 | 37000 | 1 |
0.021 | 449252 | 1 |
0.030 | 300000 | 2 |
Last trade - 10.06am 28/08/2024 (20 minute delay) ? |
Featured News
NTL (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online