I think there is something that needs to kept in mind.
Victor Kasongo et al are native French speakers as well local language. English is often a second or third language so some things dont quite out as nuanced as they should.
He said that every contract was gone through line by line to see if in line with the mining code. Review I think for bulk for essnetially correctly constituted contracts will be a fiarly minor process, but one that needs to be done so they are absolutely perfect.
The review will done against the mining which essentially a good pieces of legistlatino, and based on the mining codes such as that of Australia. The 'use it or lose it' theme is the key thing he kept on about. Obviously Tiger are doing what they should be doing so no problems.
- Forums
- ASX - By Stock
- media: mining review
I think there is something that needs to kept in mind.Victor...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TGS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online