Hi @ywtoh, you were asking about the MABR supplier for the upgrading works at Hespeler WTP, Ontario, Canada way back in Dec 2017. The tender has finally been publicised. Phase 1 scale is 9,320 m3/d and Phase 2 will be 13,980 m3/d.
If Fluence bids then they will most likely be going head-to-head with GE and Oxymem (OxyMem's name only appeared on the portal this morning as I was putting the post together).
https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/18ea1e40-b738-4554-9714-7f4cabb1a0b4
I've attached the bidding documents. Of interest is Section A-15 which codifies the bid evaluation criteria. I've attached the full document below as well as a section of evaluation criteria. Many insights into the bidding process and requirements.
Pages 204 - 2010 also may also be of interest; they contain schematics of the proposed concept for MABR integration into the plant:Thanks @Xman1983 and @stockrock for posting the updated investor deck info.
- Forums
- ASX - By Stock
- FLC
- Media update
Media update, page-2238
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FLC (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
0.003(3.85%) |
Mkt cap ! $86.47M |
Open | High | Low | Value | Volume |
7.8¢ | 8.1¢ | 7.8¢ | $29.62K | 370.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.1¢ | 77812 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.080 |
1 | 6620 | 0.078 |
1 | 100000 | 0.077 |
1 | 6756 | 0.074 |
1 | 20000 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.081 | 77812 | 2 |
0.082 | 50000 | 1 |
0.085 | 139000 | 3 |
0.091 | 77370 | 1 |
0.095 | 15000 | 1 |
Last trade - 16.10pm 14/11/2024 (20 minute delay) ? |
Featured News
FLC (ASX) Chart |