Anyone read anything or have opinion on if it’s harder to manufacture a 4680 cell rather than a 2170 if a company sticks to traditional wet slurry applications?? - it isn't. The dry application saves hectares of drying room space and 3 days. When they apply the wet mix to the foil it needs to be dried before it can be used to build a battery.
Did he say copper foil (I didn't watch it)? The cathode is applied to aluminium foil and the anode to copper. They don't have a problem with the dry anode application as graphite is heat resistant. The problem Tesla has is when they speed up the production line it generates heat. The heat is turning the cathode into a gooey mess.
- Forums
- ASX - By Stock
- NVX
- Media Watch - NVX related
Media Watch - NVX related, page-13575
-
- There are more pages in this discussion • 971 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVX (ASX) to my watchlist
|
|||||
Last
72.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $354.7M |
Open | High | Low | Value | Volume |
73.0¢ | 73.5¢ | 72.0¢ | $232.2K | 318.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 514 | 72.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
73.0¢ | 4179 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 514 | 0.720 |
1 | 4360 | 0.715 |
2 | 14360 | 0.710 |
1 | 4360 | 0.705 |
5 | 112887 | 0.700 |
Price($) | Vol. | No. |
---|---|---|
0.730 | 4179 | 1 |
0.735 | 48180 | 4 |
0.740 | 98970 | 6 |
0.745 | 24347 | 2 |
0.750 | 76213 | 10 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
NVX (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online