QPM 0.00% 4.5¢ queensland pacific metals limited

The engineering work is tier 1. The more critical parts of the...

  1. 10,295 Posts.
    lightbulb Created with Sketch. 999
    The engineering work is tier 1. The more critical parts of the build would be the same. This is a major project. I'm glad that this kind of thing is being considered, as we would be quite close to this kind of tender process at this stage, possibly even begun.
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
0.000(0.00%)
Mkt cap ! $113.4M
Open High Low Value Volume
4.6¢ 4.6¢ 4.5¢ $146.1K 3.190M

Buyers (Bids)

No. Vol. Price($)
1 199999 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 284083 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.