QPM 0.00% 3.3¢ queensland pacific metals limited

Obviously difffcult to compare because we produce to many...

  1. 221 Posts.
    lightbulb Created with Sketch. 51

    Obviously difffcult to compare because we produce to many products from the same process but here are my quick calcs.

    tldr: imo bang in the middle.



    From the PFS we have OPEX as


    Area

    Cost


    1

    Ore Supply and logistics

    46.1

    million A$/a

    2

    Ore processing plant

    86.6

    million A$/a

    3

    Sulphate refinery

    12.6

    million A$/a

    4

    HPA refinery

    18

    million A$/a

    Now let’s scale up for DFS assuming that the ore supply scales with volume but the subsequent processing say scales by 75%. This gives us:

    Area

    Cost


    1

    Ore Supply and logistics

    122.2

    million A$/a

    2

    Ore processing plant

    172.2

    million A$/a

    3

    Sulphate refinery

    25.1

    million A$/a

    4

    HPA refinery

    18

    million A$/a(HPA refinery no expected to be scaled)

    With the scaled up plant we produce:

    -15700tpa contained Ni

    -1700tpa contained Co

    -Other valuable by products.


    1.Let’s start by ignoring everything except the Ni.

    -1000x 15700 / 0.45 = 34.6 million lb

    -Cost of $320 million

    This gives us A$9.2 / lb = U$6.8 / lb


    2.Now let’s consider that Ni sulphate likely to have approx. 25% premium. Given we are talking cost base let’s consider that we produce 25% more instead or it being more valuable.

    This gives us A$6.9 / lb = U$5.1 /lb


    This puts us up at the upper end, but remember that the Ni only accounts for about 50% of our revenue. Scaling point 1 by 50% gives us U$3.4 / lb placing us towards the middle of the chart.



    Last edited by OStirz: 13/09/21
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.2¢ 3.3¢ 3.0¢ $425.0K 13.49M

Buyers (Bids)

No. Vol. Price($)
1 100556 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 759250 5
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.